20 August 2026
Cylinders reconditioned instead of replaced
Two worn hydraulic cylinders put back to work instead of being replaced. Scope of work, before and after photographs and what the customer got out of it.
See the project →
2 August 2026
Annual service of an electroplating line
A full line inspection: ventilation and scrubber cleaning, nozzles, hydraulics, travel rails and carriages. See the complete scope of work and the result.
See the project →
21 July 2026
An industrial mixer back in production after a drive rebuild
Reconditioning a mixer rotation drive: cast iron welding, shaft reconditioning and a new drive train. See the scope of work and the result.
See the project →
22 May 2026
A partitioned room inside a production hall
An enclosed working area with a big bag support structure, built inside a hall that stayed in production. See the scope of work and the result.
See the project →
13 April 2026
Installing four silos — chemical anchoring and levelling
Four silos installed on a prepared foundation: chemical anchoring, 240 mm studs, levelling and verification of the fixings. See how the job ran.